Total Square Footage
198ft²
180 ft² room + 10% straight-lay waste.
Order The Boxes Before You Pull The Baseboards
Calculate exactly how many boxes of flooring, rolls of underlayment, and trim pieces you need, plus a complete tool list for your DIY install.
Free estimator. Runs locally in your browser. No signup required.
Start from a common room layout, then edit the dimensions and box coverage to match your exact flooring choice.
Measure the room at the subfloor, wall to wall. For closets and alcoves, add their square footage to the room dimensions or treat the space as one larger rectangle and let the waste factor absorb the shape.
Include closets and doorways; the waste factor absorbs odd shapes.
Printed on the box. Typical LVP is 48″ long.
Every product is different — copy the coverage number from your box, not a guess.
Diagonal layouts eat more material at every wall cut.
Most foam rolls cover 100 ft². Skip underlayment if your plank has it attached.
Estimates update automatically as you type. Waste factors: straight 10%, diagonal 15%. Always buy 1–2 extra boxes for future repairs — dye lots and click profiles change yearly.
Total Square Footage
198ft²
180 ft² room + 10% straight-lay waste.
Boxes / Cartons Needed
10boxes
Buy 1–2 extra boxes for repairs.
Underlayment Rolls
2rolls
100 ft² per roll · butt the seams, tape them.
Perimeter Trim / Baseboard
57lin ft
Perimeter + 5% for miter cuts.
Install Kit & Supplies
30 spacers · 1 install kit · 2 blade packs
Spacers every 2 ft of perimeter · fine-tooth blades for clean cuts.
Pro Notes
The acclimation clock starts the moment the boxes come inside. Plan the demo and prep around it, not the other way around.
Flooring, underlayment, tools, and trim, in store order. Quantities match this room’s math.
Laminate and vinyl are dimensionally alive. They swell in humid summers and shrink in dry winters, and a floating floor needs somewhere to go. The 1/4″ to 1/2″ gap around every wall, doorway, and pipe is that somewhere.
Skip it and the floor grows until it runs out of room, then it goes up. The middle of the room peaks into a ridge you can feel underfoot, seams pop, and the only fix is tearing up the floor and re-laying it with a proper gap. I have pulled floors where the planks had pushed so hard against the drywall that the baseboards were being levered off the wall. The gap hides under baseboard or shoe molding anyway — it costs nothing and saves the whole job. Move the furniture out before you start; our moving box and truck calculator sizes the boxes and truck for clearing the room.
The boxes ship and store in warehouses that are colder, hotter, and drier than your house. Bring them inside, stack them flat in the center of the room, and let them sit 48 hours before you click a single plank. The material needs to reach your home’s temperature and humidity before it gets locked together, because it expands and contracts after installation, not before.
Skip the acclimation and the movement happens after the floor is locked down: gaps open between planks in winter, or the floor crowds itself and peaks in summer. Do not store the boxes in the garage or against an outside wall while you wait, and do not stack them against the wall you are about to floor against. Two days is cheap insurance against a tear-out.
End joints that march down the floor in a neat diagonal stair-step look mechanical and concentrate stress along one line. An H-pattern, where end seams line up every other row, is worse: the matching joints act like a hinge and the click-lock lips crack along that line within a year.
The fix is random stagger. Cut the first row, and start the second row with the leftover cutoff, whatever length it is, as long as end joints stay at least 6 inches apart. Keep the offcuts and use them to start later rows. Random stagger spreads the joints, strengthens the lock, and looks like a real floor instead of a diagram.
Underlayment does three jobs: it smooths small subfloor imperfections, cushions the click-lock from below, and manages moisture. Over a plywood or OSB subfloor, standard foam underlayment is the default. Over concrete, you need a vapor barrier — 6-mil poly or an underlayment with an attached moisture barrier — because concrete wicks moisture and swollen cores start at the bottom. Cork is the upgrade when sound matters, like over a finished room below.
Two rules installers argue about less than they used to: roll the underlayment with the seams butted, never overlapped, and tape the joints so they stay put while you work. And if your plank has underlayment attached, do not add another layer underneath — doubled cushion flexes the click-lock and voids most warranties.
Laminate’s decor layer chips like eggshell when a coarse blade hits it. Use a fine-tooth blade, 60 teeth or more, and for a jigsaw or circular saw cut with the face side down so the teeth exit on the back. A miter saw cuts from the top, so cut face-up there. A dedicated laminate cutter snicks planks cleanly with zero dust and is worth renting for a whole house.
Vinyl plank is different: score the wear layer deeply with a sharp utility knife and snap, or use a fine jigsaw blade for notches around door jambs. Dull blades tear the wear layer instead of cutting it, and torn edges show at every seam — so swap blades the moment the cut starts dragging, and cut door jambs with an undercut saw so the plank slides underneath instead of around.
The cleanest result comes from removing the baseboards, installing the floor with the expansion gap, and reinstalling the trim over the gap. If removal is not realistic, leave them in place and cover the gap with quarter-round or shoe molding. Score the caulk line with a utility knife before prying so you do not tear the drywall paper — and if you are repainting the trim or walls afterward, our room paint and primer estimator sizes that paint.
Usually yes, if the tile is solid, flat, and the grout lines are shallow. Loose or cracked tiles need to be re-adhered or removed, and deep grout lines wider than about 1/4″ should be filled with leveling compound first, or the plank joints will flex and the click-lock lips will crack. Check door clearances too, because the floor height will rise.
Over concrete, yes: 6-mil poly or an underlayment with an attached moisture barrier, because concrete wicks moisture and laminate cores swell when they drink it. Over plywood or OSB you usually skip the vapor barrier and use standard underlayment. When in doubt, tape a plastic square to the subfloor overnight; condensation under it means barrier.
A miter saw with a fine-tooth blade, 60 teeth or more, is the standard; coarse framing blades chip the decor layer on the upstroke. If you cut with a jigsaw or circular saw, cut with the face side down so the teeth exit on the back. For vinyl plank, a sharp utility knife score-and-snap is often cleaner than any saw — and if you are cutting custom trim to match, our woodworking cut list calculator sizes the lumber for baseboards and transitions.
Damp mop only, never wet. The fiberboard core drinks standing water and the edges swell, and no amount of drying shrinks them back. Skip steam mops entirely, use a pH-neutral laminate cleaner or a light vinegar dilution, wring the mop until it barely dampens, and wipe up spills when they happen. Wet mopping is the most common way laminate floors die early.
Laminate is a poor choice for wet rooms because the fiberboard core swells when water finds a seam. Waterproof LVP is the right product there, and even then you need to manage seams and standing water. If you must use laminate in a half bath, caulk the perimeter and every seam, and expect a shorter floor life.
A tapping block spreads your mallet blows across the plank edge so you can seat the click-lock without breaking the fragile locking lip, which snaps if you strike the plank directly. The pull bar hooks the last row, where there is no room to swing a mallet, and levers it tight against the previous row. Both come in most installation kits — tap gently and squarely and the cheap kit blocks work fine.
Use a transition molding — a reducer for a height step or a T-molding for equal heights — installed in the doorway with its own expansion gap. Mount the molding track to the subfloor, then snap the molding in. Never butt the laminate tight to the carpet tack strip; the floor still needs room to move. If you are building custom transition trim, our woodworking cut list calculator sizes the lumber.
We’re building optional Pro features for serious flooring projects. Everything on this page stays free.